Read a little. Learn a lot. • Tightly-written news, views and stuff • Follow us on TwitterBe a Facebook FanTumble us!
 

Posted on May 16, 2011 | tags

 
 

World: Despite massive damage, Fukushima timetable stays the same

  • 9 months maximum needed to get Fukushima under control source
  • » That number isn’t changing: While they’ve discovered more damage than they originally anticipated — such as damage to fuel reactors — and are still dealing with meltdowns. Despite these discouraging discoveries, officials are sticking to this timetable, saying that the reactors are continuing to cool despite the more extensive damage. “The point [Japanese Prime Minister Naoto] Kan is making is that the reactor cores are being cooled down despite the apparent meltdown,” said Goshi Hosono, the prime minister’s special adviser on the issue.
 
More in World (520 of 3068 articles)